Verify #293: AUDIT protocol surfaces + align QA docs with #300 routing #444

Merged
PlasticDigits merged 2 commits from cursor/gitlab-issue-verification-0d93 into main 2026-06-08 05:27:09 +00:00
PlasticDigits commented 2026-06-07 12:26:10 +00:00 (Migrated from gitlab.com)

Summary

Verification pass for GitLab #293 — Arena AUDIT/protocol surfaces match the cyberminimalist glass system with current Arena v2 operator copy.

Implementation on main already satisfies acceptance criteria. This MR only aligns §293 QA docs with 100% podium buy routing (#300) where they still referenced legacy 40/30/30 admin-split wording.

Merge conflict resolution: Merged current main (glass-arena UI). Single conflict in docs/frontend/arena-views.md §293 — kept MR's detailed 100% DOUB buy routing to four podium tracks (25% per category · 70/20/10 epoch tranches; #300) wording.

Acceptance criteria → verification

Criterion Command / check Result
Merge conflicts with main git merge origin/main on cursor/gitlab-issue-verification-0d93 PASS
AUDIT surfaces match new visual language Playwright: /arena/protocol H1 AUDIT, .arena-protocol__decision-grid (VERIFY/TRACE/WATCH), state deck, donate card, activity feed; desktop 1280×900 + mobile 390×844 overflow ≤1px PASS
Operator copy reflects Arena v2 (no TimeCurve/sale framing) Grep protocol components; Playwright body scan for timecurve/sale end/redemption/fee sink; FeeTransparency.test.tsx, ArenaProtocolDonatePoolsSection.test.tsx PASS
Donate pools, vault reads, live buy activity functional Stack smoke: curl http://127.0.0.1:3100/v1/arena/buys + /v1/arena/activity after onchain buy; e2e/arena.spec.ts donate-pools + activity testids PASS
Wallet profile modal + explorer links from AUDIT Playwright: click .address-inline__profile-btn in activity → dialog + View on explorer link; contract rows target=_blank explorer href PASS
Automated frontend gate cd frontend && npm run typecheck && npm run lint && npm test PASS (562 tests)
Arena E2E (protocol route) VITE_E2E_MOCK_WALLET=1 npm run test:e2e -- --workers=5 e2e/arena.spec.ts (preview on :4173) PASS (8/8)
Arena CSS naming bash scripts/check-arena-naming.sh PASS
Doc anchors bash scripts/check-doc-anchors.sh PASS
Donate wrong-network gate (Rabby) ChainMismatchWriteBarrier wired (arena-protocol-donate-pools-chain-write-gate); full wrong-chain overlay not re-run (optional per manual QA §293) SKIP — mock wallet cannot switch chains; component + test wiring verified

Doc changes

  • docs/testing/manual-qa-checklists.md §293 copy-review bullet
  • docs/frontend/arena-views.md §293 mechanics bullet
  • docs/testing/frontend-content-audit.md /arena/protocol mechanics row

Closes #293

## Summary Verification pass for [GitLab #293](https://gitlab.com/PlasticDigits/yieldomega/-/work_items/293) — **Arena AUDIT/protocol surfaces** match the cyberminimalist glass system with current Arena v2 operator copy. Implementation on `main` already satisfies acceptance criteria. This MR only aligns §293 QA docs with **100% podium buy routing** ([#300](https://gitlab.com/PlasticDigits/yieldomega/-/issues/300)) where they still referenced legacy **40/30/30** admin-split wording. **Merge conflict resolution:** Merged current `main` (glass-arena UI). Single conflict in `docs/frontend/arena-views.md` §293 — kept MR's detailed **100% DOUB buy routing to four podium tracks (25% per category · 70/20/10 epoch tranches; #300)** wording. ## Acceptance criteria → verification | Criterion | Command / check | Result | |-----------|-----------------|--------| | Merge conflicts with `main` | `git merge origin/main` on `cursor/gitlab-issue-verification-0d93` | **PASS** | | AUDIT surfaces match new visual language | Playwright: `/arena/protocol` H1 **AUDIT**, `.arena-protocol__decision-grid` (VERIFY/TRACE/WATCH), state deck, donate card, activity feed; desktop 1280×900 + mobile 390×844 overflow ≤1px | **PASS** | | Operator copy reflects Arena v2 (no TimeCurve/sale framing) | Grep protocol components; Playwright body scan for `timecurve`/`sale end`/`redemption`/`fee sink`; `FeeTransparency.test.tsx`, `ArenaProtocolDonatePoolsSection.test.tsx` | **PASS** | | Donate pools, vault reads, live buy activity functional | Stack smoke: `curl http://127.0.0.1:3100/v1/arena/buys` + `/v1/arena/activity` after onchain buy; `e2e/arena.spec.ts` donate-pools + activity testids | **PASS** | | Wallet profile modal + explorer links from AUDIT | Playwright: click `.address-inline__profile-btn` in activity → dialog + **View on explorer** link; contract rows `target=_blank` explorer href | **PASS** | | Automated frontend gate | `cd frontend && npm run typecheck && npm run lint && npm test` | **PASS** (562 tests) | | Arena E2E (protocol route) | `VITE_E2E_MOCK_WALLET=1 npm run test:e2e -- --workers=5 e2e/arena.spec.ts` (preview on :4173) | **PASS** (8/8) | | Arena CSS naming | `bash scripts/check-arena-naming.sh` | **PASS** | | Doc anchors | `bash scripts/check-doc-anchors.sh` | **PASS** | | Donate wrong-network gate (Rabby) | `ChainMismatchWriteBarrier` wired (`arena-protocol-donate-pools-chain-write-gate`); full wrong-chain overlay not re-run (optional per manual QA §293) | **SKIP** — mock wallet cannot switch chains; component + test wiring verified | ## Doc changes - `docs/testing/manual-qa-checklists.md` §293 copy-review bullet - `docs/frontend/arena-views.md` §293 mechanics bullet - `docs/testing/frontend-content-audit.md` `/arena/protocol` mechanics row Closes #293
PlasticDigits commented 2026-06-07 12:26:21 +00:00 (Migrated from gitlab.com)

mentioned in issue #293

mentioned in issue #293
ghost1 commented 2026-06-07 12:28:38 +00:00 (Migrated from gitlab.com)

Security review

Commit reviewed: 79955b1013f6f880b5a71dc9e269cd3c121bda54
Scope: MR !444 — documentation-only alignment of AUDIT/§293 QA copy with 100% podium buy routing (#300); replaces legacy 40/30/30 admin-split wording in three markdown files.

Files reviewed

  • docs/frontend/arena-views.md
  • docs/testing/frontend-content-audit.md
  • docs/testing/manual-qa-checklists.md

Method

  • Inspected full MR diff (single commit; 3 insertions / 3 deletions).
  • Traced for attacker-controlled input reaching security-sensitive sinks — not applicable (no runtime code, config, dependencies, or secrets).
  • Checked prior MR discussions — no prior security-review threads to reconcile.

Outcome

FINDINGS: 0 (no medium, high, or critical issues on this diff)

This change updates static QA/checklist prose and internal doc links only. It does not modify application code, smart contracts, indexer APIs, auth paths, dependency manifests, or CI. No injection, authz, SSRF, XSS, secret-leakage, or supply-chain surface is introduced or exposed.

No inline threads — nothing to anchor on the diff.

## Security review **Commit reviewed:** `79955b1013f6f880b5a71dc9e269cd3c121bda54` **Scope:** MR !444 — documentation-only alignment of AUDIT/§293 QA copy with **100% podium buy routing** ([#300](https://gitlab.com/PlasticDigits/yieldomega/-/issues/300)); replaces legacy **40/30/30** admin-split wording in three markdown files. ### Files reviewed - `docs/frontend/arena-views.md` - `docs/testing/frontend-content-audit.md` - `docs/testing/manual-qa-checklists.md` ### Method - Inspected full MR diff (single commit; 3 insertions / 3 deletions). - Traced for attacker-controlled input reaching security-sensitive sinks — **not applicable** (no runtime code, config, dependencies, or secrets). - Checked prior MR discussions — no prior security-review threads to reconcile. ### Outcome **FINDINGS: 0** (no medium, high, or critical issues on this diff) This change updates static QA/checklist prose and internal doc links only. It does not modify application code, smart contracts, indexer APIs, auth paths, dependency manifests, or CI. No injection, authz, SSRF, XSS, secret-leakage, or supply-chain surface is introduced or exposed. _No inline threads — nothing to anchor on the diff._
ghost1 commented 2026-06-08 05:21:52 +00:00 (Migrated from gitlab.com)

added 5 commits

  • 79955b10...c5859b48 - 4 commits from branch main
  • b43f5264 - merge main: resolve arena-views.md conflict (keep #300 routing detail)

Compare with previous version

added 5 commits <ul><li>79955b10...c5859b48 - 4 commits from branch <code>main</code></li><li>b43f5264 - merge main: resolve arena-views.md conflict (keep #300 routing detail)</li></ul> [Compare with previous version](/PlasticDigits/yieldomega/-/merge_requests/74/diffs?diff_id=1838903772&start_sha=79955b1013f6f880b5a71dc9e269cd3c121bda54)
PlasticDigits commented 2026-06-08 05:22:28 +00:00 (Migrated from gitlab.com)

changed the description

changed the description
PlasticDigits commented 2026-06-08 05:27:10 +00:00 (Migrated from gitlab.com)

mentioned in commit 909d63d007

mentioned in commit 909d63d00792c382793fc335fd922f1041d02b92
PlasticDigits (Migrated from gitlab.com) merged commit 909d63d007 into main 2026-06-08 05:27:10 +00:00
ghost1 commented 2026-06-08 05:29:50 +00:00 (Migrated from gitlab.com)

mentioned in commit 6d823d5746

mentioned in commit 6d823d5746a0422b30350d2557c48b9f5de1fa84
PlasticDigits commented 2026-06-08 05:30:22 +00:00 (Migrated from gitlab.com)

mentioned in merge request !442

mentioned in merge request !442
PlasticDigits commented 2026-06-08 08:45:13 +00:00 (Migrated from gitlab.com)

mentioned in commit 3d9291d507

mentioned in commit 3d9291d507cc9b08522de73d339937916d6fd360
PlasticDigits commented 2026-06-08 08:45:14 +00:00 (Migrated from gitlab.com)

mentioned in commit d5ee46397a

mentioned in commit d5ee46397a3c3435e005b12923abadadb7b8f46b
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
code/yieldomega!444
No description provided.