Owns S3 (leftover-complete) for ADR 0001 / #50.

After S1+S2+WP-pre land on main, run ADR 0001 Tests item 4 / Observability plant-check:

  1. Open a dedicated plant-check PR into main (draft == false, no WIP title prefix, at least one file changed).
  2. Do not request reviewers via UI or POST .../requested_reviewers.
  3. GET pulls/{n} and pulls/{n}/reviews immediately after open; fail-closed pair per ADR 0001.
  4. If both signals empty, wait 30s and re-GET; pass only if still empty.
  5. Record {n} and both JSON bodies here, then close the probe without merge.

Disqualify leftover plants on pulls/49 and the original pulls/50. Not a close gate for the S2+WP-pre successor PR.

Owns **S3** (leftover-complete) for [ADR 0001](docs/adr/0001-remove-catchall-codeowners.md) / [#50](https://git.cl8y.com/code/ust1-window/issues/50). After S1+S2+WP-pre land on `main`, run ADR 0001 Tests item 4 / Observability plant-check: 1. Open a **dedicated** plant-check PR into `main` (`draft == false`, no `WIP` title prefix, at least one file changed). 2. Do not request reviewers via UI or `POST .../requested_reviewers`. 3. GET `pulls/{n}` and `pulls/{n}/reviews` immediately after open; fail-closed pair per ADR 0001. 4. If both signals empty, wait 30s and re-GET; pass only if still empty. 5. Record `{n}` and both JSON bodies here, then **close the probe without merge**. Disqualify leftover plants on pulls/49 and the original pulls/50. Not a close gate for the S2+WP-pre successor PR.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
code/ust1-window#51
No description provided.