community-test fork PR (cutover PoC) #3

Open
community-test wants to merge 1 commit from community-test/hello:issue/5-community-pr into main
First-time contributor

PoC for GitLab issue 5. Community user opened this from a fork. Should not merge without CODEOWNERS + Woodpecker. Safe to close.

PoC for GitLab issue 5. Community user opened this from a fork. Should not merge without CODEOWNERS + Woodpecker. Safe to close.
Add a community-fork note for cutover PoC.
All checks were successful
ci/woodpecker/pr/woodpecker Pipeline was successful
4ef60cb8d1
Author
First-time contributor

issue-5 re-verify: community-test can comment on a public issue/PR.

issue-5 re-verify: community-test can comment on a public issue/PR.
Owner

drain skip: no occupying job for rebase/fix-pr/CI-wait; remaining continue

drain skip: no occupying job for rebase/fix-pr/CI-wait; remaining continue
Owner

drain skip: default autoland requires tip ACCEPT (#77)

drain skip: default autoland requires tip ACCEPT (#77)
Owner

drain skip: default autoland requires tip ACCEPT (#77)

drain skip: default autoland requires tip ACCEPT (#77)
All checks were successful
ci/woodpecker/pr/woodpecker Pipeline was successful
Required
Details
This pull request is blocked because it's outdated.
This branch is out-of-date with the base branch
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u "issue/5-community-pr:community-test-issue/5-community-pr"
git switch "community-test-issue/5-community-pr"
Sign in to join this conversation.
No reviewers
code/maintainers
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
code/hello!3
No description provided.