[Epic] v2 pool-only launch readiness #57

Closed
opened 2026-04-09 03:23:30 +00:00 by PlasticDigits · 10 comments
PlasticDigits commented 2026-04-09 03:23:30 +00:00 (Migrated from gitlab.com)

Summary

Functional and operational readiness for pool-only swaps (router + direct pair; hybrid unset).

Evidence

  • docs/reviews/20260409T030009Z/REVIEW.md §9
  • docs/reviews/20260409T030009Z/RELEASE_READINESS_MATRIX.md
  • Makefile build-optimized vs .github/workflows/test.yml cargo wasm

Rationale

v2 is the most complete path; close CI/release gaps first.

Dependencies

None.

Acceptance criteria

  • Child issues for CI policy and launch runbook done or waived with sign-off

Launch blockers

  • blocker:v2 — pool-only production launch
  • blocker:launch — core DEX go-live
## Summary Functional and operational readiness for **pool-only** swaps (router + direct pair; `hybrid` unset). ## Evidence - `docs/reviews/20260409T030009Z/REVIEW.md` §9 - `docs/reviews/20260409T030009Z/RELEASE_READINESS_MATRIX.md` - `Makefile` `build-optimized` vs `.github/workflows/test.yml` cargo wasm ## Rationale v2 is the most complete path; close CI/release gaps first. ## Dependencies None. ## Acceptance criteria - [ ] Child issues for CI policy and launch runbook done or waived with sign-off ## Launch blockers - `blocker:v2` — pool-only production launch - `blocker:launch` — core DEX go-live
PlasticDigits commented 2026-04-09 03:23:43 +00:00 (Migrated from gitlab.com)

mentioned in issue #66

mentioned in issue #66
PlasticDigits commented 2026-04-09 03:23:44 +00:00 (Migrated from gitlab.com)

marked this issue as related to #66

marked this issue as related to #66
PlasticDigits commented 2026-04-09 03:23:45 +00:00 (Migrated from gitlab.com)

mentioned in issue #67

mentioned in issue #67
PlasticDigits commented 2026-04-09 03:23:46 +00:00 (Migrated from gitlab.com)

marked this issue as related to #67

marked this issue as related to #67
PlasticDigits commented 2026-04-09 03:23:47 +00:00 (Migrated from gitlab.com)

mentioned in issue #68

mentioned in issue #68
PlasticDigits commented 2026-04-09 03:23:48 +00:00 (Migrated from gitlab.com)

marked this issue as related to #68

marked this issue as related to #68
PlasticDigits commented 2026-04-09 03:23:49 +00:00 (Migrated from gitlab.com)

mentioned in issue #69

mentioned in issue #69
PlasticDigits commented 2026-04-09 03:23:50 +00:00 (Migrated from gitlab.com)

marked this issue as related to #69

marked this issue as related to #69
PlasticDigits commented 2026-04-09 03:24:27 +00:00 (Migrated from gitlab.com)

marked this issue as related to #86

marked this issue as related to #86
PlasticDigits commented 2026-04-13 04:10:45 +00:00 (Migrated from gitlab.com)

Epic 57 child issues 66, 67, 68, 69, and 86 are addressed on main (latest commits): hybrid CI wasm policy with workspace-optimizer workflow + docs; launch runbook; canonical fee tier reference + test fixture alignment; digest-pinned LocalTerra/Postgres; pool-only smoke script. Integration verification: run GitHub Actions Contracts WASM (workspace-optimizer) for release artifacts; make test-contracts and make lint-contracts pass locally; E2E should pick up compose digest pins via updated workflow paths. @brouie Please verify each child issue (66–69, 86) before closing this epic, and run a full staging smoke (deploy + scripts/smoke-pool-swap.sh + optional Playwright) for end-to-end confidence.

Epic 57 child issues 66, 67, 68, 69, and 86 are addressed on `main` (latest commits): hybrid CI wasm policy with workspace-optimizer workflow + docs; launch runbook; canonical fee tier reference + test fixture alignment; digest-pinned LocalTerra/Postgres; pool-only smoke script. Integration verification: run GitHub Actions `Contracts WASM (workspace-optimizer)` for release artifacts; `make test-contracts` and `make lint-contracts` pass locally; E2E should pick up compose digest pins via updated workflow paths. @brouie Please verify each child issue (66–69, 86) before closing this epic, and run a full staging smoke (deploy + `scripts/smoke-pool-swap.sh` + optional Playwright) for end-to-end confidence.
PlasticDigits (Migrated from gitlab.com) closed this issue 2026-04-20 12:04:33 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
code/cl8y-dex-terraclassic#57
No description provided.