fix(router): fit funded pool reverse quotes within 3M query budgets #1427

Merged
PlasticDigits merged 5 commits from fix/issue-1422-funded-reverse into main 2026-10-06 06:42:22 +00:00
Owner

Funded reverse quotes previously exceeded the SDK53 default 3M smart-query budget. Query-local capability and factory discovery reuse now keeps amount-dependent tax previews and final forward sufficiency fresh, while SDK gas errors invalidate executable quotes without retry/fanout.

The integrated release preserves #1398 net execution floors and hook bounds: router 1.4.0, pair 1.21.0, factory 1.12.0 and community-tax token 1.3.0. Rollout defaults/checklists match these versions, and evidence-index migration runs through the separate #1396 migrator. Merge reconciliation also isolates library/API config fixtures from checkout/ancestor dotenv files and fixes disposable PostgreSQL readiness to require its final TCP server.

References #1422. Production rollout remains #1384, #1386 and #1421; populated four-hop greedy support remains #1428. Historical standalone receipts in docs/qa/issue-1422 establish the earlier router 1.3.1/pair 1.20.0 result and must not be treated as the new release.

Integrated validation:

  • Fresh pinned optimized build with verified source/lock/image/artifact provenance and updated checksums.
  • Six funded scenarios and all 18 actual smart queries pass twice on a fresh isolated SDK53 node at unchanged 3,000,000 gas; frozen router 1.3.0 regression reproduced twice.
  • make verify-issue-1398: 7 PASS, 0 FAIL, 0 SKIP; full contract workspace and 168 frontend signing tests per focused pass.
  • make verify-issue-1397: library, 15 API and 7 budget/recovery tests pass twice.
  • make verify-issue-1396: 28 PASS, 0 FAIL, 2 explicit host-network skips; 564 library, 43 API-security, actual CLI, ACL and isolated database checks repeated.
  • make verify-issue-1422 source/client/API groups: 8 PASS, 0 FAIL; chain/baseline work completed independently against the fresh final artifacts as above.
  • Production frontend types/build, changed-indexer formatting and ordinary commit/push hooks pass. Hosted CI skipped by explicit operator instruction; no passing CI status is claimed.

Funding/launch-guard regressions and the final integrated receipt are recorded with the merge closeout. Local evidence does not establish production deployment or universal populated-book support.

Funded reverse quotes previously exceeded the SDK53 default 3M smart-query budget. Query-local capability and factory discovery reuse now keeps amount-dependent tax previews and final forward sufficiency fresh, while SDK gas errors invalidate executable quotes without retry/fanout. The integrated release preserves #1398 net execution floors and hook bounds: router 1.4.0, pair 1.21.0, factory 1.12.0 and community-tax token 1.3.0. Rollout defaults/checklists match these versions, and evidence-index migration runs through the separate #1396 migrator. Merge reconciliation also isolates library/API config fixtures from checkout/ancestor dotenv files and fixes disposable PostgreSQL readiness to require its final TCP server. References #1422. Production rollout remains #1384, #1386 and #1421; populated four-hop greedy support remains #1428. Historical standalone receipts in docs/qa/issue-1422 establish the earlier router 1.3.1/pair 1.20.0 result and must not be treated as the new release. Integrated validation: - Fresh pinned optimized build with verified source/lock/image/artifact provenance and updated checksums. - Six funded scenarios and all 18 actual smart queries pass twice on a fresh isolated SDK53 node at unchanged 3,000,000 gas; frozen router 1.3.0 regression reproduced twice. - make verify-issue-1398: 7 PASS, 0 FAIL, 0 SKIP; full contract workspace and 168 frontend signing tests per focused pass. - make verify-issue-1397: library, 15 API and 7 budget/recovery tests pass twice. - make verify-issue-1396: 28 PASS, 0 FAIL, 2 explicit host-network skips; 564 library, 43 API-security, actual CLI, ACL and isolated database checks repeated. - make verify-issue-1422 source/client/API groups: 8 PASS, 0 FAIL; chain/baseline work completed independently against the fresh final artifacts as above. - Production frontend types/build, changed-indexer formatting and ordinary commit/push hooks pass. Hosted CI skipped by explicit operator instruction; no passing CI status is claimed. Funding/launch-guard regressions and the final integrated receipt are recorded with the merge closeout. Local evidence does not establish production deployment or universal populated-book support.
fix(router): fit funded reverse quotes within 3M query budgets
Some checks failed
ci/woodpecker/pr/woodpecker Pipeline failed
a7bc8a7e3d
Reuse query-local discovery while retaining fresh tax previews and forward validation. Add deterministic provider gas errors, regression receipts and rollout guidance.
docs(qa): publish concise SDK runtime metadata
Some checks failed
ci/woodpecker/pr/woodpecker Pipeline failed
b496dbd307
Record runtime versions and the complete dump checksum while retaining pinned image and gas receipts. Document the hosted scanner limitation.
docs(qa): verify the recorded build snapshot after commit
Some checks failed
ci/woodpecker/pr/woodpecker Pipeline failed
c45a960337
Preserve the original build revision and validate committed source bytes against the receipt. Record the remaining hosted scanner findings.
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
code/cl8y-dex-terraclassic!1427
No description provided.