Record merge checks and refresh the pinned pair rollout helper #1387

Merged
PlasticDigits merged 1 commit from merge/receipt-20261004 into main 2026-10-04 11:17:37 +00:00
Owner

The reviewed pair-rollout helper rejected the later #1381 router/token contract tree before reaching dry-run. Pin the whole-tree guard to the tested #1381 revision while retaining the identical pair 1.19.0 checksum; use the primary-checkout command in its documentation after retiring the old verification worktree. Record combined PR #1379/#1382/#1383 checks, fixture repair, explicit production follow-ups and branch/worktree/stash cleanup.

Validation: helper shell syntax and safe dry-run; #1376/#1381 documentation checks; standard commit hooks (contract formatting/Clippy, frontend types and staged secret scan). The combined product checks and LocalTerra receipts are summarized in docs/qa/merge-2026-10-04.md. CI is intentionally skipped under the merge instruction. No production migration is claimed; remaining rollout stays in #1384/#1385/#1386.

The direct final push was rejected by Forgejo protected-main policy; this PR uses the normal merge path without weakening protection. Refs #1376, #1380, #1381, #1386.

The reviewed pair-rollout helper rejected the later #1381 router/token contract tree before reaching dry-run. Pin the whole-tree guard to the tested #1381 revision while retaining the identical pair 1.19.0 checksum; use the primary-checkout command in its documentation after retiring the old verification worktree. Record combined PR #1379/#1382/#1383 checks, fixture repair, explicit production follow-ups and branch/worktree/stash cleanup. Validation: helper shell syntax and safe dry-run; #1376/#1381 documentation checks; standard commit hooks (contract formatting/Clippy, frontend types and staged secret scan). The combined product checks and LocalTerra receipts are summarized in docs/qa/merge-2026-10-04.md. CI is intentionally skipped under the merge instruction. No production migration is claimed; remaining rollout stays in #1384/#1385/#1386. The direct final push was rejected by Forgejo protected-main policy; this PR uses the normal merge path without weakening protection. Refs #1376, #1380, #1381, #1386.
Record merge checks and refresh the pinned pair rollout helper
All checks were successful
ci/woodpecker/pr/woodpecker Pipeline was successful
52b5f505f4
PlasticDigits deleted branch merge/receipt-20261004 2026-10-04 11:17:37 +00:00
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
code/cl8y-dex-terraclassic!1387
No description provided.